8.3.10 GoTo
The GoTo modifier enables a jump from the selection tree executing for the moment, to another selection tree in a rating period, with a start date valid for the moment.
Preferences for a jump to be performed are as follows:
- The Selection Tree to jump from must have the same Service as the Selection Tree to jump to.
- The Selection Tree to jump to must have a start date valid for the moment. This also means that jumping to a Rating Period in the same Rating Plan is impossible, since only one Rating Period in a Rating Plan can have a start date valid for the moment.
- It is not possible to jump to the initial point again. The reason for this is to avoid circular execution. This is only checked in runtime (execution of the tree) and results in a Tree Execution Exception. If a chain of jumps is made, it is not allowed to jump to a tree that has earlier been in the jump series, of the same reason.
The selections in the drop-down show the possible targets in the form Rating Period name(Service)Rating Plan, see Figure 181.
Below the GoTo modifier is displayed, showing a jump in the Selection Tree, see Figure 182.
If NONE is selected as a tree to go to, an exception is thrown in execution.

