7.4.2 Trace
The trace output shows a detailed output of the parameters after a simulation, see Figure 107.
The Table 63 explains the trace output figure above.
| Simulation output section | Description |
|---|---|
| 1 | Information regarding the selection of the rating period used in the trace.
|
| 2 | The Full DataSet Output always shows:
It shows all the data fields that were set as mandatory and therefore were considered in the simulation. It also shows values they have received through the execution (if applicable). |
| 3 | Full representation of the tree that has been executed. |
| 4 | Parameters that have been changed, which means parameters that have received another value during execution. |
| 5 | Printout regarding the whole execution. Total cost – shows the sum cost of this execution. Total duration – shows for how long the call case executed. This is dependent on what values were submitted in the Duration parameter. Start time – at what time this execution begun. End time – when execution ended Allocated duration, Total allocated duration, or Duration to time switch. |